The new internal quinchos: a top-level construction work After several months of work, with an investment of 100 million pesos, River Plate finished the work done on this sector, one of the historical and most important spaces for the River Plate family’s social life.

  • Share

This brand-new area comprises a total of 2000 square meters covered and two dining rooms, one of which can be used as a multi-use room for different events. Besides, it can hold up to 600 people and includes two new restrooms (including two bathrooms for people with reduced mobility.)

Apart from that, the 20 grill units and the 40 enamelled grates with braziers. There are more than 400 lockers and an integrated space for fridges, freezers and electric stoves.

Other details of the work

-100% LED lighting.

-Wi-Fi connection.

-Four 65-inch LED TVs in the main lounge.

-Kitchen and cloakrooms only available for events.

-Expansion semi-covered pergola.

-Giant 2x4-metre screen in the multiple-use room.

-Usage of 405 square meters of green space during the eight months outside the summer season.

-Surround sound systems in both rooms and the sound room.

-VIP area for events.

-Cutting-edge air conditioning and heating systems in both rooms.

-Video surveillance system.

-Access control at both entrances with turnstiles, doors for people with reduced mobility and reception desks.

Rodolfo D’Onofrio (President), Jorge Brito (1st Vice president), Stefano Di Carlo (2nd Vice president), Ignacio Villaroel (Secretary), Mariano Taratuty (Assistant Treasurer and President of Works and Infrastructure) and members of the Executive Committee were at the opening act.

D’Onofrio commented: “It’s an emblematic place for the Club’s members, a place for them to use with their families and friends, sport and match mates. It’s a part of the River Plate members’ spirit.”

He added: “The Club is experiencing a very important moment, I congratulate the Infrastructure Area on this, on the player’s training, the home locker room, the works at River Camp, the field in Hurlingham for the Youth division, other works that are not seen and others that are needed. And we’re doing this during a very complicated moment for the country.”

Thus, River carried out a completely new construction work with low-maintenance technologies and methods which are unalterable over time, so as to provide members with a first-class service.

Photo gallery